• Preview of Dental Unit Waterline Management ProcedureWord document preview

Infection Prevention and Control

Dental Unit Waterline Management Procedure

$12.99 FreeIncluded DOCX
Word document · 42 KB

3 downloads per free account, no card needed.

Need more than 3? Get all 300 templates for $249 One payment, lifetime access, including every template added later.

Who this is for

A dentist whose waterline test came back high and who found the practice had no written routine for flushing, shock treatment or what to do next.

What is inside

  • 21 numbered steps in 6 stages with decisions routed to step numbers
  • Water quality target table with the CDC limit and the HTM 01-05 monitoring note for the UK
  • Between-patient flushing of 20 to 30 seconds as the CDC 2003 guidelines recommend
  • Boil-water advisory stage built on the CDC 2003 recommendations
  • Task schedule table per unit with frequency and owner
  • Records table and link to the waterline testing log

How to use it: Fill in your dental unit and treatment product names and the manufacturer's test interval before use.

Files & formats
  • DOCXdental-unit-waterline-management-procedure.docx42 KB

Opens in Microsoft Word or Excel, Google Docs or Sheets and LibreOffice. Delivered instantly from your browser.

Free downloads & full access

Every account gets 3 free downloads. Re-downloading a template you already have does not count. This template on its own is $12.99, and buying it keeps your free downloads for something else. Full access is a one-time $249 for all 300 templates, for life.

Bought with a different email? Open your account and enter your order number.

Licence

Use and adapt the document inside your own organisation or for your own clients. Do not resell or republish the templates themselves. These templates are original working documents built on the public guidance named here. They are not legal or contractual advice and are not endorsed by its publisher. Guidance changes: check the current official text.